BELAK, L., MARUŠA, R., PIHLER, J., ZAGORIČNIK, A.
RECONSTRUCTION OF 220 KV BUS IN THE SUBSTATION 400/220/110 KV PODLOG
KOMUNALNA ENERGETIKA / POWER ENGINERING, 21
This Article describes the reconstruction of 220 kV bus (isolation and the corresponding material) in the substation 400/220/110 kV Podlog. The switching substation 220 kV has been in operation since the early seventies. Due to the long year operation and to the worn out equipment, the operations are no longer reliable. Because of this, the bus reconstruction was made in 2011. At that time, there was a primary objective that during the reconstruction the electro energetic system would be as less disturbed as possible. For this purpose, has been analyzed the operation of the 400 and 220 kV network during the reconstruction. The focus was on the implementation of the reconstruction to ensure the least disturbed electro energetic system and consequently the uninterrupted supply of electricity to consumers.

  HOME MEETING SCHEDULE CONTENT PRESENTATION ARCHIVE E-REGISTRATION